Skip to main content
Tarmasters Asphalt Paving
(816) 789-0700

Driveway Paving in Overland Park, KS

Replacements, resurfaces, and new drives — built on a limestone base that answers Johnson County clay.

Call (816) 789-0700

Tarmasters paves residential driveways across Overland Park, Kansas. Because the ground is Martin-Woodson series clay-loam that swells and shrinks with moisture, a lasting drive here needs 6–8 inches of compacted limestone base, a grade that sheds water, and supported edges. Insured and bonded, paving since 2014.

Driveway work in Overland Park splits along the same line the city does. North of about 135th Street the housing is largely 1960s–1980s in northern areas — neighborhoods like Wycliff and Milburn, where most drives are on their second or third surface and the original base is an open question. South of there the stock is newer, and the work is usually a first replacement or new construction.

Either way the ground is the same: Martin-Woodson series clay-loam. It is the reason a drive here can look fine for three years and then crack across the middle — the clay moved, and the base was not deep enough to carry that movement. This page is about driveways specifically; the Overland Park hub covers the wider market, and commercial lots are a different build.

The three jobs we do most here

Full replacement. The old surface comes out, the base gets rebuilt where it needs it, and a new drive goes in. This is the honest answer when a drive has connected cracking or areas that sink — a new surface over a failed base cracks along the same lines within a couple of seasons.

Resurfacing. Where the base is still sound and the surface is simply worn out, a new wearing course costs less and lasts well. On older north-side drives we check what is underneath before recommending it, because the base is the variable.

New drives and widenings. New construction on the south side, extra parking, or converting gravel. Gravel conversions are usually straightforward — the stone is already there; the questions are depth, cleanliness, and compaction.

New residential asphalt driveway with a clean apron transition to the street

What Martin-Woodson series clay-loam means for your driveway

Most driveway quotes in Overland Park describe the asphalt. The asphalt is the part that varies least. Here is where a drive built for this ground differs from a drive built anywhere.

Element Typical shortcut What we do here Why
Base depth Thin base, common on older drives 6–8 in. compacted crushed limestone Clay-loam swells and shrinks; the base has to spread load across the movement.
Separator None Geotextile fabric where pumping is a risk Stops clay migrating up into the stone and destroying the base from within.
Grade Follows the old drive Reset to shed water 34 in. frost depth means anything holding water moves in winter.
Edges Left unsupported at the lawn Backfilled and supported No curb on a residential drive — the edge is the weak point.
Maintenance Sealcoat and hope Crack seal on a 2–3 year cycle ~38 freeze-thaw cycles a year drive water into every open crack.

Building an Overland Park driveway the right way

Most residential drives are a single day on site once the schedule opens up.

01

Tear-out and subgrade check

The old drive comes out and we proof-roll what is underneath. On Johnson County clay the soft spots show themselves under load — better to find them now than to bridge over them.

02

Grade set for drainage

Overland Park's rolling topography usually gives us real fall to work with. We use it: water leaves the drive rather than sitting on it, because standing water is what reaches the clay.

03

Limestone base, compacted

Crushed limestone goes down and gets compacted in lifts. On expansive clay this base is what spreads the load — a geotextile separator goes in where clay pumping is a risk.

04

Hot mix and rolling

Asphalt is laid at the thickness passenger loads call for, then rolled to full compaction while it is still hot. Density is what keeps water out of the mat itself.

05

Edges and the apron

Edges get backfilled and supported, and the apron is tied into the garage slab and the street with no lip. Unsupported edges are the first thing to crumble on a residential drive.

Who does the work

Tarmasters is Kansas City–owned, based in Lee's Summit, and the asphalt division of Ford Concrete and Paving. Paving the metro since 2014 — both sides of the state line — insured and bonded.

You get a measured, fixed estimate and a firm timeline, and we tell you honestly whether your drive needs replacing or whether a resurface will hold. Both answers are common here; which one you get depends on what we find under the surface, not on what is easier to sell.

Overland Park neighborhoods we serve

North Overland Park — older stock, unknown bases

Wycliff, Milburn, and the streets around them. Mostly 1960s–1980s in northern areas construction, so drives here are usually on their second or third surface and the original base is the variable we check first.

Central and west — Westbrooke South, Nottingham St. Andrews, Pinehurst

A mix of eras, reached off Metcalf Ave and the cross streets. Rolling ground here usually gives us fall to work with, which makes drainage easier to get right than on a flat site.

South of 135th St — newer construction

The 2000s–2020s side of the city, out toward 151st St. First replacements and new drives, where the base can be built right the first time instead of inherited.

Driveway paving nearby

Also see driveway paving across the metro or the full service area.

Overland Park driveway questions

What does a driveway cost in Overland Park?

Square footage first, then how much old material comes out and what the subgrade looks like underneath. A straight replacement over a base that still holds is the cheapest version. Costs rise when the clay has to be dug out and rebuilt, when the grade needs correcting so water stops running toward the garage, or when access is tight. We measure it and give you a fixed number before anything starts.

Is asphalt a good choice on Johnson County clay?

It is, provided the base under it is right. Asphalt flexes, which is an advantage on ground that moves seasonally — it tolerates small movements that would crack a rigid slab. What it will not tolerate is being laid thin over unprepared clay. The base is where the money should go here.

How long before we can park on it?

Driving on it is usually fine after a day or two, depending on temperature and thickness. Parking is different: new asphalt stays soft enough early on that a kickstand, trailer jack, or turning the wheel while stopped can mark it. Give it a few weeks before anything sits in one place.

Do you work in the older north Overland Park neighborhoods?

Yes — Wycliff, Milburn, and the surrounding streets are mostly 1960s–1980s in northern areas housing, so those drives are usually on their second or third surface. The unknown there is what the original base was, which is why we check rather than assume before quoting a resurface.

Ready to pave it right?

Get a straight estimate and a clear timeline. Tarmasters Asphalt Paving handles driveways, parking lots, and repairs across the Kansas City metro.

Call Now: (816) 789-0700
Asphalt paving machine